{"id":5531,"date":"2026-09-07T07:19:46","date_gmt":"2026-09-07T07:19:46","guid":{"rendered":"https:\/\/stripes4all.com\/?p=5531"},"modified":"2026-09-07T07:43:11","modified_gmt":"2026-09-07T07:43:11","slug":"plan-inventory-scanner-fleet-device-requirements","status":"publish","type":"post","link":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/","title":{"rendered":"Planning an Inventory Scanner Fleet: How Many Devices Does a Project Need?"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container has-pattern-background has-mask-background nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--link_color: var(--awb-color5);--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1272px;margin-left: calc(-6% \/ 2 );margin-right: calc(-6% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:2.82%;--awb-margin-bottom-large:20px;--awb-spacing-left-large:2.82%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:2.82%;--awb-spacing-left-medium:2.82%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:2.82%;--awb-spacing-left-small:2.82%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><p>Planning an <strong>inventory scanner fleet<\/strong> requires more than counting the people assigned to a project. Shift patterns, floor area, item structure, device performance, charging times and contingency capacity all affect the number of <a href=\"https:\/\/stripes4all.com\/en\/rent-inventory-scanners\/\">rental inventory scanners<\/a> required. Too few devices create waiting time and put deadlines at risk. Too many increase rental, transport, issue and return costs.<\/p>\n<p>Retailers and inventory service providers therefore benefit from a transparent calculation model. The starting point is the number of counters working at the same time, not the total workforce. Devices for team leaders, quality checks and technical reserve are then added. The plan should also state when scanners will be charged, exchanged and moved between locations.<\/p>\n<p>A useful calculation remains simple enough to adapt to new projects. It relies on evidence from comparable operations, records its assumptions and includes a realistic buffer. This enables device demand to be coordinated with software, staffing and logistics before the inventory date.<\/p>\n<p>Collect reliable planning data during the quotation and preparation stages. Opening hours, counting windows, team sizes, travel distances and unusual operating conditions all matter. Assign an owner and a review date to every important assumption. When circumstances change, update the device plan as well as the staffing schedule. This keeps the reason for any increase or reduction in demand transparent.<\/p>\n<\/div><div class=\"awb-toc-el awb-toc-el--1\" data-awb-toc-id=\"1\" data-awb-toc-options=\"{&quot;allowed_heading_tags&quot;:{&quot;h2&quot;:0},&quot;ignore_headings&quot;:&quot;&quot;,&quot;ignore_headings_words&quot;:&quot;&quot;,&quot;enable_cache&quot;:&quot;yes&quot;,&quot;highlight_current_heading&quot;:&quot;no&quot;,&quot;hide_hidden_titles&quot;:&quot;yes&quot;,&quot;limit_container&quot;:&quot;all&quot;,&quot;select_custom_headings&quot;:&quot;&quot;,&quot;icon&quot;:&quot;fa-flag fas&quot;,&quot;counter_type&quot;:&quot;none&quot;}\" style=\"--awb-padding-top:2%;--awb-padding-bottom:2%;--awb-item-font-size:20px;--awb-item-color:var(--awb-color5);--awb-item-margin-top:4px;--awb-item-margin-bottom:4px;--awb-item-font-family:&quot;Miltram Semibold&quot;;--awb-item-font-style:normal;--awb-item-font-weight:400;\"><div class=\"awb-toc-el__content\"><ul class=\"awb-toc-el__list awb-toc-el__list--0\"><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_1_Determine_the_number_of_simultaneous_counters\">1. Determine the number of simultaneous counters<\/a><\/li><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_2_Include_productivity_floor_area_and_item_structure\">2. Include productivity, floor area and item structure<\/a><\/li><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_3_Calculate_contingency_devices_according_to_risk\">3. Calculate contingency devices according to risk<\/a><\/li><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_4_Plan_batteries_charging_points_and_shift_changes\">4. Plan batteries, charging points and shift changes<\/a><\/li><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_5_Coordinate_software_configuration_and_data_flow\">5. Coordinate software, configuration and data flow<\/a><\/li><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_6_Organise_issue_return_and_transport\">6. Organise issue, return and transport<\/a><\/li><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_7_Document_demand_with_a_simple_formula\">7. Document demand with a simple formula<\/a><\/li><li class=\"awb-toc-el__list-item\"><a class=\"awb-toc-el__item-anchor\" href=\"#toc_8_Run_a_pilot_define_support_and_approve\">8. Run a pilot, define support and approve the plan<\/a><\/li><\/ul><\/div><\/div><div class=\"fusion-title title fusion-title-1 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">1. Determine the number of simultaneous counters<\/h2><\/div><div class=\"fusion-text fusion-text-2\"><p>First establish how many people will scan at the same time. With two shifts, the total workforce may be larger than the number of devices needed concurrently. Focus on peak periods and account for staggered starts, breaks, recounts and teams that are active only during part of the operation.<\/p>\n<p>Separate regular counters from other roles that require a device. Team leaders may verify areas or support discrepancy work. Staff responsible for sampling and follow-up checks may also need dedicated scanners. A role matrix prevents those requirements from being discovered only when the project begins.<\/p>\n<p>Show demand for each operating window in a simple table. If one night shift finishes before the next store begins, equipment may be reused. Return, data transfer, inspection and transport must still fit between the two assignments. Do not assume immediate availability unless those intermediate steps have been confirmed.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-2 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">2. Include productivity, floor area and item structure<\/h2><\/div><div class=\"fusion-text fusion-text-3\"><p>Headcount alone does not predict counting output. A warehouse with accessible standard barcodes differs from a retail floor containing variants, damaged labels or hard-to-reach products. Use measured results from comparable projects and conduct a small pilot where the operating environment is new.<\/p>\n<p>Plan by counting area. Record volume, complexity, available time and required teams for each area. The result is a demand profile across the operating period. It identifies the highest number of scanners in simultaneous use and shows whether devices can be transferred between areas.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-3 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">3. Calculate contingency devices according to risk<\/h2><\/div><div class=\"fusion-text fusion-text-4\"><p>A technical reserve covers failures, transport damage and unexpected additional teams. The appropriate buffer depends on project size, duration, distance from the equipment store and the speed of replacement. A central location with immediate exchange can operate differently from a programme spread across remote stores.<\/p>\n<p>Express the reserve as both a fixed quantity and a percentage, then select the value that addresses the greater project risk. Spare scanners must be configured, charged and clearly identified. A device without the current project setup is not a dependable reserve.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-4 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">4. Plan batteries, charging points and shift changes<\/h2><\/div><div class=\"fusion-text fusion-text-5\"><p>Battery endurance must match the operating window. Consider screen brightness, wireless connections, scan frequency, battery age and cold environments. Manufacturer specifications provide guidance but do not replace a realistic test. Long shifts may require charged replacement batteries or designated exchange devices.<\/p>\n<p>Check the power supply, number of charging positions and time available between shifts. Charging stations need a safe, accessible area and a clear allocation process. A documented charging routine reduces the risk of issuing supposedly available scanners with insufficient power.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-5 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">5. Coordinate software, configuration and data flow<\/h2><\/div><div class=\"fusion-text fusion-text-6\"><p>Every device should receive the correct project configuration before dispatch or issue. This includes user roles, counting areas, item master data and connection settings. <a href=\"https:\/\/stripes4all.com\/en\/inventory-software\/\">Cloud-based inventory software<\/a> can simplify central control, but synchronisation and possible offline conditions still require testing.<\/p>\n<p>Stripes is cloud-based and ERP-independent. Fleet planning therefore needs to cover how master data is supplied, count results are transferred and devices are assigned to different projects. Allow adequate time for configuration, functional testing and documentation instead of leaving these tasks until immediately before deployment.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-6 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">6. Organise issue, return and transport<\/h2><\/div><div class=\"fusion-text fusion-text-7\"><p>Device planning includes the physical journey of each scanner. Record its serial number or internal identifier, recipient, location, charge status and accessories. On return, check condition and completeness. A standard handover record reduces searching and supports rapid reuse.<\/p>\n<p>Transport cases should separate scanners, charging equipment and reserves clearly. Plan delivery times, local contacts and return transport for every location. International or widely distributed projects need additional time buffers. Define who coordinates replacement if a delivery is delayed or a device fails.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-7 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">7. Document demand with a simple formula<\/h2><\/div><div class=\"fusion-text fusion-text-8\"><p>A practical starting formula is: simultaneous counters plus devices for leadership and control plus technical reserve. Add project-specific requirements, such as dedicated equipment for goods receipt, high-bay areas or recounting. Always round to whole devices and document the reason for each addition.<\/p>\n<p>Create a timeline as well. It shows when devices are required at each location and when they become available for another project. The same fleet can support several operations if their windows do not overlap. Recalculate the requirement whenever staffing, shifts or locations change.<\/p>\n<\/div><div class=\"fusion-title title fusion-title-8 fusion-sep-none fusion-title-text fusion-title-size-two\" style=\"--awb-margin-top-small:10px;--awb-margin-right-small:0px;--awb-margin-bottom-small:10px;--awb-margin-left-small:0px;\"><h2 class=\"fusion-title-heading title-heading-left\" style=\"margin:0;\">8. Run a pilot, define support and approve the plan<\/h2><\/div><div class=\"fusion-text fusion-text-9\"><p>Before a large deployment, test the complete workflow: issue, login, scanning, data transfer, battery exchange and return. Record the time taken, errors and support demand. Stripes provides 24\/7 support, but internal escalation routes and named contacts should still be defined so that operational questions reach the right person quickly.<\/p>\n<p>According to Stripes, the platform supports around 4,000 projects and more than 180 million scans each year. The appropriate fleet size still depends on the individual operation. Available models are outlined on the <a href=\"https:\/\/stripes4all.com\/en\/prices\/\">Prices page<\/a>. <a href=\"https:\/\/stripes4all.com\/en\/contact\/\">Contact the Stripes team<\/a> to discuss device demand, inventory software and a suitable rental model for your project.<\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":5530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","footnotes":""},"categories":[41],"tags":[],"class_list":["post-5531","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-inventory-scanners"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Plan an Inventory Scanner Fleet | Stripes<\/title>\n<meta name=\"description\" content=\"Learn how retailers and inventory service providers calculate scanner demand, reserve devices, batteries and logistics for inventory projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plan an Inventory Scanner Fleet | Stripes\" \/>\n<meta property=\"og:description\" content=\"Learn how retailers and inventory service providers calculate scanner demand, reserve devices, batteries and logistics for inventory projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/\" \/>\n<meta property=\"og:site_name\" content=\"stripes4all.com\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-07T07:19:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-07T07:43:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/stripes4all.com\/wp-content\/uploads\/2026\/09\/inventory-scanner-fleet-planning.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1666\" \/>\n\t<meta property=\"og:image:height\" content=\"944\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Ismail \u00d6zk\u00f6seoglu\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ismail \u00d6zk\u00f6seoglu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Plan an Inventory Scanner Fleet | Stripes","description":"Learn how retailers and inventory service providers calculate scanner demand, reserve devices, batteries and logistics for inventory projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/","og_locale":"en_US","og_type":"article","og_title":"Plan an Inventory Scanner Fleet | Stripes","og_description":"Learn how retailers and inventory service providers calculate scanner demand, reserve devices, batteries and logistics for inventory projects.","og_url":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/","og_site_name":"stripes4all.com","article_published_time":"2026-09-07T07:19:46+00:00","article_modified_time":"2026-09-07T07:43:11+00:00","og_image":[{"width":1666,"height":944,"url":"https:\/\/stripes4all.com\/wp-content\/uploads\/2026\/09\/inventory-scanner-fleet-planning.png","type":"image\/png"}],"author":"Ismail \u00d6zk\u00f6seoglu","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ismail \u00d6zk\u00f6seoglu","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/#article","isPartOf":{"@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/"},"author":{"name":"Ismail \u00d6zk\u00f6seoglu","@id":"https:\/\/stripes4all.com\/en\/#\/schema\/person\/985879d393221b91293ee86c55c04565"},"headline":"Planning an Inventory Scanner Fleet: How Many Devices Does a Project Need?","datePublished":"2026-09-07T07:19:46+00:00","dateModified":"2026-09-07T07:43:11+00:00","mainEntityOfPage":{"@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/"},"wordCount":5557,"image":{"@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/#primaryimage"},"thumbnailUrl":"https:\/\/stripes4all.com\/wp-content\/uploads\/2026\/09\/inventory-scanner-fleet-planning.png","articleSection":["Inventory scanners"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/","url":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/","name":"Plan an Inventory Scanner Fleet | Stripes","isPartOf":{"@id":"https:\/\/stripes4all.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/#primaryimage"},"image":{"@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/#primaryimage"},"thumbnailUrl":"https:\/\/stripes4all.com\/wp-content\/uploads\/2026\/09\/inventory-scanner-fleet-planning.png","datePublished":"2026-09-07T07:19:46+00:00","dateModified":"2026-09-07T07:43:11+00:00","author":{"@id":"https:\/\/stripes4all.com\/en\/#\/schema\/person\/985879d393221b91293ee86c55c04565"},"description":"Learn how retailers and inventory service providers calculate scanner demand, reserve devices, batteries and logistics for inventory projects.","breadcrumb":{"@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/#primaryimage","url":"https:\/\/stripes4all.com\/wp-content\/uploads\/2026\/09\/inventory-scanner-fleet-planning.png","contentUrl":"https:\/\/stripes4all.com\/wp-content\/uploads\/2026\/09\/inventory-scanner-fleet-planning.png","width":1666,"height":944,"caption":"Reliable device planning accounts for counting teams, reserves, batteries and logistics."},{"@type":"BreadcrumbList","@id":"https:\/\/stripes4all.com\/en\/plan-inventory-scanner-fleet-device-requirements\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/stripes4all.com\/en\/"},{"@type":"ListItem","position":2,"name":"Planning an Inventory Scanner Fleet: How Many Devices Does a Project Need?"}]},{"@type":"WebSite","@id":"https:\/\/stripes4all.com\/en\/#website","url":"https:\/\/stripes4all.com\/en\/","name":"Stripes4all.com","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/stripes4all.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/stripes4all.com\/en\/#\/schema\/person\/985879d393221b91293ee86c55c04565","name":"Ismail \u00d6zk\u00f6seoglu","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4a44cb5ceb7a94abac263eeeb5a4527cbce3ed2ab5a0f2a8b2222f9df61e2664?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4a44cb5ceb7a94abac263eeeb5a4527cbce3ed2ab5a0f2a8b2222f9df61e2664?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4a44cb5ceb7a94abac263eeeb5a4527cbce3ed2ab5a0f2a8b2222f9df61e2664?s=96&d=mm&r=g","caption":"Ismail \u00d6zk\u00f6seoglu"},"sameAs":["http:\/\/stripes4all.mlsretailsoftware.com"],"url":"https:\/\/stripes4all.com\/en\/author\/ismail\/"}]}},"_links":{"self":[{"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/posts\/5531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/comments?post=5531"}],"version-history":[{"count":2,"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/posts\/5531\/revisions"}],"predecessor-version":[{"id":5535,"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/posts\/5531\/revisions\/5535"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/media\/5530"}],"wp:attachment":[{"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/media?parent=5531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/categories?post=5531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stripes4all.com\/en\/wp-json\/wp\/v2\/tags?post=5531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}